Reference
0000321777
Issued by
Saskatchewan Power Corporation (SaskPower)
Published
May 8, 2026
Deadline
Jun 5, 2026  Overdue
Sector
infrastructure
Contract type
works
Geography
Saskatchewan Canada
Value range
>$10M
Source
View original
Scope of Work:  SaskPower is seeking new construction of approximately 19km and 18km of 230kV transmission line to sectionalize the current B4R/B5R double circuit line and connect in/out to the new Tableland Switching Station.  This new line will consist of direct embed 230kV double circuit galvanized H-frame structures with double-circuit twin-bundled Drake ACSR conductor. To complete the Work, a temporary bypass line will be constructed to allow one circuit of the B4R/B5R line to be energized. The by-pass work includes installation of temporary dead-end structures to facilitate sectionalizing of the B4R/B5R line, and dead-ending of overhead shield wires on B2W and B1K lines, salvage existing lattice tower structures #428 and #429, salvage the conductors and shield wires between structures #428 and #429 and deadending of shield wires on B2W 138kv at structure #16 and at structure #19 and B1K 230kV at structure #8 and at structure #14A (Structure B1K #9 is a deflection). Structure T1B/T2B #430 will be raised, this work is not part of this scope of work and will be done by others. Project Timelines:  Successful achievement of Construction Completion in accordance with the requirements of the Contract no later than March 15, 2027.   

Draft Proposal

No draft yet for this opportunity.